TRACK PROBLEMS
Selected images revealing problems with industrial track.
LACK OF MAINTENANCE -- The problems in this piece of track include track that is badly out of alignment, cross-level across the
rails is bad, less visible but significant are many rotted ties, consecutive ties missing spikes and loose joint bars. Also note the brush and lack
of adequate drainage. Ballast was marginal with evidence of mud having leeched up at some joints.
ROTTED CROSS TIES -- (LOWER FOREGROUND) The evidence here is the standing spike on the right and a tie plate that
has cut into the tie. On the left the tie plate is loose and there is a split radiating out from the spike along the center
of the tie. Note the cinder ballast
HEAD WORN RAIL -- The rail on the left side of the joint has a worn head. It is obvious when looking at the top
of the joint bar. The lip of the joint bar is rolled down and torn by the flanges of passing cars actually riding on on the flange
instead of the rail head. This rail dates to about 1930.
RAIL END BREAK -- This rail broke out through a bolt hole. It happened to be on the field side of a curve and was
an invitation for a derailment.
SUN KINK -- Here's one of the fabled sun kinks that literally shifted the entire track towards a parallel track. The cause was
unanchored rail, and cinder ballast that could not hold track on a particularly hot and sunny day.
ORDER YOUR COPY OF THE INDUSTRIAL TRACK INSPECTION GUIDE TODAY
CLICK ON THE LOGO AT THE TOP OF THIS PAGE TO SEE THE INDUSTRIAL TRACK INSPECTION GUIDE
Price $124.95 plus shipping
Canadian orders using credit card only, please call to place order.
ORDERING INFORMATION
or Your Purchase Order
Click here for a handy ORDER FORM for mail orders
ABOUT US I SITE MAP I CONTACT US I PRIVACY POLICY
Copyright 2008 Cam-Tech Publishing. All rights reserved.